Project Synopsis
Noble bloodline descendants, Business Barons, Globetrotters, Millenepreneurs, High Net worth Individuals... Whatever be your stately origins, trust us to understand your refined tastes and serve you in a distinguished fashion. We recognise that all of you share certain notable traits - Larger than life personas, carefully curated tastes, an endless zest for life and a roaring appetite for accomplishments. For you, life is a never-ending conquest and resting on laurels is just not an option. You are the equivalent of a modern-day Maharaja!
Location
Old No 14, New No 30, Ranjith Road and Ferry road, Kotturpuram, Chennai, Tamil Nadu 600085
Project Specifications
- Shell: RCC frame structure with masonry partitions. Height of each floor shall be 12 feet from slab to slab.
- Masonry: Internal masonry — Good quality table moulded bricks or Aerocon blocks or concrete block masonry with protective corner beading in GI, completed with plaster
- Living & Dining: Beige color Italian marble laid with paper joints and finished with 8 coats (mirror) polish.
- Bedrooms: Italian marble flooring with paper joints and finished with 8 coats (mirror) polish. Option for wooden flooring in the master bedroom.
- Kitchen: Marble flooring
- Sit-Out: Premium tiles
- Staircase: Italian marble
- Italian marble with inlay wall cladding up to false ceiling height in master toilet
- Designer tiles up to false ceiling height in other toilets
- Italian marble counter tops
- Water Closets: Western style, porcelain EWC of Duravit in all bathrooms
- Wash Basins: Porcelain wash basins of Duravit in all bathrooms
- CP Fittings of Grohe / Hansgrohe
- All basins shall be provided with a CP waste coupling and CP bottle trap of standard make
- Kitchen Sink: Stainless steel sink with drain board of Franke / Nirali
- Cockroach Traps: Detachable stainless steel cockroach traps with lid of Chilly or equivalent make shall be provided in all bathrooms
- Bathrooms will be provided with shower cubicle
- Overhead Showers: Overhead showers of Grohe / Kohler make shall be provided in all bathrooms
- Faucets: All faucets shall be CP, heavy body metal fittings of Grohe / Kohler
- Hot water connection shall be provided to the shower and wash basin in each bathroom and to the sink in the kitchen
- Plumbing: All external water supply lines and drainage lines shall be in PVC pipes
- Internal water supply lines will be in concealed CPVC pipes
- Kitchen Platforms: Premium granite Dado of 2 feet above kitchen platforms in premium granite
- Provision for washing machine and dryer in all homes
- Kitchen cabinets
- Hob: A 4-burner hob with electrical ignition of Siemens / equivalent make shall be provided in the kitchen
- Chimney: A 90 cm ductable electric chimney of Siemens / equivalent make with anodized aluminium filters and a capacity of 1000 cubic metres per hour shall be provided in the kitchen
- Main Door: Teakwood frame doors with teakwood shutters and antique finish. Main door shall have a height of 8 feet.
- Other doors with teakwood frame shutters with natural wood veneer finish. Bedroom door shall have a height of 8 feet
- Schuco sliding doors / windows
- Finish: The internal door shutters and frames shall be provided with a melamine matt finish
- Hardware: All hardware shall be brush finished stainless steel. The main door shall be provided with night latch of Yale or equivalent make. All other doors will be provided with door bolts and a mortise lock or tubular / cylindrical lock
- Doorstoppers: Magnetic / concealed doorstoppers of Hafele or equivalent make shall be provided for the main door and bedroom doors
- 3-phase supply with independent meters and phase change facility in each home
- Daikin / Toshiba Air-conditioning with VRV system
- Concealed electrical wiring with Finolex cables or equivalent and sufficient points with Panasonic or Legrand or equivalent modular switches
- 3-phase power supply and an MES meter
- Telephone and TV points shall be provided in living room and all bedrooms
- False ceiling with LED lights
- Home automation in living and dining areas.
- Data points and CAT 6 cables for all bedrooms and living areas.
- Bedrooms: Full length wardrobe with mirror in all bedrooms and provision for an inbuilt safe shall be provided in the master bedroom
- Master bathrooms: Mirror with backing ply and edge trim, louvered shutters below the counter.
- Finishing: Natural veneer exteriors shall be finished in melamine matt finish and the inner surfaces in varnish or paint
- Back-up Power: Full back-up power shall be provided to the entire unit — 15 KVA per unit and also to the common area lighting, pumps, motors etc. The generators shall have acoustic enclosures and an AMF Panel with an automatic change-over switch
- Rainwater Harvesting: Percolation pits shall be provided.
- Elevators: Mitsubishi passenger elevators shall be provided with automatic doors and stainless steel finish inside the cabins. Elevators shall be provided with multi-beam sensors for door operations and down collective system.
- Soil: Good quality red soil and sand mixture with manure shall serve as the base layer for landscaping
- Soft landscaping: Grass, shrubs and bamboo etc. shall be provided and all garden areas shall be completely landscaped
- Security cameras at the main gate, ground floor & entrance.
- 24 hours security and intercom with CCTV management
- Private garden
- Backyard with pergola seating and gymnasium.
- Swimming pool